Specification & Cost Plan — Turning Ideas into Numbers
- Ирина Колесниченко
- Oct 10
- 1 min read
Updated: 10 hours ago

What this stage is about
Once the design is approved, we translate it into technical language: materials, systems, finishes, and costs.This is where creativity meets precision.
🔹 What’s included
Structural system: type of timber (solid, laminated), insulation (mineral wool, cellulose, PIR).
Windows & doors: thermal coefficients (Uw, g-value).
Roofing: insulation layers, vapor barriers, drainage.
MEP systems: heating, ventilation (MVHR), heat pump, PV integration, smart control options.
Finishes: exterior materials and interior packages (chalet, loft, scandi, minimal).
Energy tiers: Standard, A-Class, A+ (near-passive).
🔹 Why this stage matters
Accurate specifications prevent delays and miscommunication between designer, factory, and installers.This is where your fixed price and production schedule are confirmed.
🕒 Duration: 1–2 weeks🎯 Result: a clear cost breakdown, material list, and confirmed factory order.
Comments